Hamilton City Council installed a permanent onsite standby generator to run two 150kW Pumps at the Pukete Water Reservoir.  One Electrical was contracted to carry out the electrical installation.

The scope of the project

  • Wire power cabling between generator and Main Control Cabinet (MCC) including cable support systems
  • Wire automatic changeover controls between mains and generator supply.
  • Wire generator status feedback to PLC
  • System commissioning